This Old House 43x20
Season 43 · Episode 20
Watch
Overview
At the house, out front we get to know the contractor while Ipe is being installed on the porch ceiling. Out back, a brick patio is laid. Inside, a dual fuel HVAC system is installed and ducts ran. At the Dracut Centre School, corbels are restored.
Comments
Sign in to join the conversation.