This Old House 45x11

Season 45 · Episode 11

Watch

Overview

Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.

Comments

Sign in to join the conversation.